1. Pay attention to the seal to prevent leakage.
2. To pay attention to the instrument’s direction must be consistent with the actual flow direction
3. Note not let the gasket protruding into the pipe after the installation
4. The instrument is installed in the open pipe valve, pay particular attention not to form a negative pressure in the pipeline gauge installation site, so as to avoid damage to the instrument.
5. The flange surface must clean up, and ensure no sealing effects of the damage
6. the flange connection hole of the related parts is connected to lined up properly
7. The seal shall not be damaged before and after the installation, When installing, ensure that the center and the center of the pipeline lined up properly
Post time: Oct-24-2022